2003

Home About Site About Us Contact Us 

 

Meeting

Department of Environmental Protection

City Planning

Videos & Realities

Platinum, McDonalds & Us

2004

United States Forestry Service

WV Miss Utility

2005

Written Agreement

2006

An Uplifting Experience

2007

A Sinking Experience 

Professional Engineering Reports

Utilities

WV Public Service Commission

August 2007

A Platinum Endeavor

Persistence or Negligence 

The Event

Summary

Legal Aspects

Q&A

Stark Realities

Night & Day

The 800 LB Gorilla

 

 
     
City Planning
 


June 6, 1996 Denial The Why Caution

 
 
PRE DEVELOPMENT
 The Thrasher Engineering Plan




* A Fifty Foot Setback is shown in the engineering plan, which was within the guidelines of the then existing zoning.

* Building (C) 113 Platinum Drive illustrates a very noticeable Small Parking Lot Area.

* This plan was DENIED by the COB for a lack of 15 parking spaces. Per the (left) June 6, 1996 COB letter.


 



 

 

         
July 1, 1996: Go Ahead Anyway   The Results    Imagery

 
 
2003 POST DEVELOPMENT
 Greenleaf Engineering Survey
 (What The July 1, 1996 Approval Led To)



* A Fifty Foot Setback DOES NOT EXIST, which violates the zoning that was in place in an extreme way.

* Building (
C) 113 Platinum Drive, illustrates a very noticeable Large Finished Parking Lot Area.

* Earthen fill was pushed against and then up a Generational Landowner's Locust Post Grid Fence Line. A fence line which became the lateral support for the development and its underground utilities.

* The parking lot the drainage system was constructed with built-in restrictions, which allowed both buildings roofs to be used as retention ponds.


 

The stage was now set for Massive City Wide Destruction.


 
     
 


@Copyright 2003 - 2008